Case Study: Emergency Weld Repairs on a Newly Installed Vibratory Caisson

When Pepco discovered fatigue cracks during an important transmission line construction project, the company had to take immediate action to resolve the issues. Download this case study to read about the steps Pepco followed to execute weld repair on its newly installed caisson to keep the project on track.